
Dredge Pump Rental & Distributor Program
Become a distributor or project partner for Dredge Pump. We support regional distributors and project integrators with OEM and private-label supply, technical training and marketing assets — with regional focus across Russia, the CIS, Central Asia and the Middle East, plus Africa, South America and Southeast Asia.





Dredge pump supply for contractors and distributors — dredging is project work, so the equipment decision is tied to project length, site access and what happens to the pump when the job ends.
- Single-casing construction — no liner to break on cut material
- A22 cast steel casings (1200 MPa, HRC45); A23 components
- A25 weldable where on-vessel repair is required
- Discharge rotatable to fit existing ladder and pipework
- Submersible and horizontal builds both available
- MOQ 1 set; standard models in stock 7–10 days
CE · EAC · ISO 9001 · ISO 14001 · ISO 45001
Matching Supply to Project Work
Dredging equipment decisions are project decisions. Four questions usually settle the specification.
- How long is the project? Wear parts should be sized against the project duration, not against calendar hours. A six-month job and a three-year job justify different material choices.
- Can a damaged casting leave site? If not, specify A25 weldable material so repair is possible in place. This is the single most useful question for remote or island work.
- What geometry does the vessel impose? The rotatable discharge means one pump build fits several ladder and pipework arrangements — useful where the same pump moves between vessels.
- Submersible or horizontal? Submersible works at the bed with no suction lift; horizontal on a pontoon suits coarser material and longer discharge lines.
Standard models are held in stock and despatch in 7–10 days, which matters when a project pump fails mid-contract.
Supply, Certification and Inspection
We manufacture rather than trade — casting, machining, assembly and testing all happen in our own plants. That is what makes the technical answers on these pages possible in the first place.
| Minimum order | 1 set |
|---|---|
| Lead time | Standard models held in stock: 7–10 days. Other models: within 30 days, depending on quantity, wet-end material and model |
| Annual casting output | 18,000 tonnes |
| Payment terms | T/T, L/C and O/A |
| Packing | Fumigation-free wooden cases |
| Manufacturing | Four production bases and ten subsidiaries; casting, machining, assembly and testing in house |
| Foundry capacity | Six medium-frequency induction furnaces and two normalising furnaces |
| Engineering team | 85 core R&D and technical staff, averaging 15 years in the industry |
| Design and simulation | CFD hydraulic design, finite element analysis, casting simulation and 3D CAD; laboratory staffed 24 hours |
| Certification | ISO 9001:2015 covering quality, environment and occupational health; energy management system; CE under the MD and EMC directives; EAC 004 and EAC 010 |
| Testing | Every pump performance-tested before despatch, at a national-level pump testing centre to GB3216-2005 |
| Intellectual property | 5 invention patents and 25 utility model patents; drafting member of 5 industry group standards |
| Export markets | Pumps in service in more than 100 countries |
| Third-party inspection | Accepted; arrange the inspection body with the order |
| OEM / private label | Available; scope and conditions confirmed at enquiry |
More Pictures




What to Send With Your Enquiry
Send the project duration, the bed material and largest particle size, the discharge distance and lift, the vessel or platform arrangement, and whether damaged castings can be shipped off site. We will confirm the model, the material and a spares holding sized to the project.
Send Your Enquiry
How should wear parts be sized for a project?
Against the project duration rather than calendar hours. A short contract and a multi-year operation justify different material and stocking decisions.
What if a casting is damaged on a remote site?
Specify A25 (HB300–350). It is weldable, so repair in place is possible rather than waiting out a replacement delivery.
Can one pump serve several vessels?
Often yes. The discharge rotates to any orientation, so the same pump build fits different ladder and pipework geometries.
What is your minimum order quantity?
One set. Wear parts can be added to the same order and ship in the same consignment.
What is the lead time?
Standard models held in stock despatch in 7–10 days. Other models are delivered within 30 days, depending on quantity, wet-end material and model.
What payment terms do you accept?
T/T, L/C and O/A, agreed against order size and the commercial relationship.
Do you hold CE and EAC certification?
Yes — ISO 9001:2015 covering quality, environment and occupational health, an energy management system certificate, CE under the MD and EMC directives, and EAC 004 and EAC 010 for the Eurasian Economic Union.
Are you a manufacturer or a trading company?
A manufacturer. Four production bases and ten subsidiaries, with casting, machining, assembly and testing in house, and annual casting output of 18,000 tonnes.
How are pumps packed for export?
In fumigation-free wooden cases, which avoids the treatment and documentation that solid-wood packing requires in most destinations.
Do you accept third-party inspection?
Yes. Arrange the inspection body with the order and we will schedule the works test accordingly.
Manufacturer-direct supply · Technical pump-selection support · Export documentation on request.


